SourcingAI

Data center

I have found results from200000+products and70000+suppliers aboutData center

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Distribution Metering Box
Type: On-line
Type: Air-Cooled
Structure: Protection
Certification: ISO9001:2000
Form: Partly-welded Type
Operation Voltage: Low Voltage
Size: 3 Uint
Application Range: Power Plants
Shell Material: Steel Plate
Shell Protection Grade: IP55
Phase: Three Phase
Protection: Overcurrent
Classification: Lighting/Power
Standby Time: Standard Machine
Sine Wave Output UPS
Output Capacity: Medium Type
Equipment Mode: Centralized Model
Application: Communication
Condition: New
Automatic Grade: Semi-Automatic
CNC or Not: not CNC
Voltage: 380V
Instruction System: CISC
Max. CPUs: 1
Server Form Factor: 1U
Storage Capacity: >1TB
Supporting Memory Capacity: >1TB
System Architecture: X86 Server
Form Factor: 1U
Management Interface: iDRAC
Network Connectivity: 1GbE
Operating System: Windows Server
Power Supply: Redundant PSU
Processor Type: AMD EPYC
RAM Capacity: 32GB
Hybrid Storage(Combination of HDDs and SSDs)
System Type: Closed System
Fans Species: Frequency Fan
Noise Level: Low
Cooling Method: Indirect Cooling
Cooling Water: Industrial Water
Application Fields: Electronics
Certification: VDE
Certification: CCC
Certification: ISO
Certification: CE
Certification: RoHS
Size: 1 Uint
Shell Material: Stainless Steel
Protection: Unbalanced Loads
Protection: Overvoltage
Standby Time: Long-acting Machine
Output Capacity: Large Type
Application: Enterprise Level
Application: Industry
System Type: Open System
Noise Level: Ultra Low

Sourcing guidance for Data Center

What are the key technical specifications to prioritize when sourcing data center hardware?

When sourcing for data centers, focus on Power Usage Effectiveness (PUE) ratings and thermal management capabilities. Ensure servers utilize high-efficiency power supply units (80 PLUS Platinum or Titanium) to reduce operational costs. For networking, verify support for 100G/400G Ethernet architectures and low-latency switching. Storage solutions should prioritize NVMe over Fabrics (NVMe-oF) for high-speed data transfer and hot-swappable components to ensure zero-downtime maintenance.

Which international compliance standards are mandatory for data center infrastructure?

Equipment must adhere to IEC 60950-1 or IEC 62368-1 for safety. For environmental and efficiency standards, look for ENERGY STAR certification and RoHS/REACH compliance. If you are sourcing modular data center containers, ensure they meet IP65 or higher ingress protection ratings and have UL or CE marking for electrical components. Additionally, verify that the supplier follows TIA-942 or Uptime Institute Tier Standards for structural and operational reliability.

How can buyers evaluate the scalability and compatibility of modular data center solutions?

Prioritize modular 'pay-as-you-grow' architectures that allow for easy expansion of rack space, cooling, and UPS capacity. Ensure Open Compute Project (OCP) compliance to avoid vendor lock-in and guarantee compatibility with diverse hardware. Request BIM (Building Information Modeling) files or CAD drawings from the supplier to simulate integration with existing facility footprints and power grids.

What are the critical cooling and power requirements for high-density data center environments?

For high-density racks (>20kW), evaluate Liquid Cooling (Cold Plate or Immersion) versus traditional CRAC/CRAH units. Ensure the Uninterruptible Power Supply (UPS) systems use Lithium-ion batteries for a smaller footprint and longer lifecycle. Demand N+1 or 2N redundancy for all critical power paths to mitigate the risk of single-point failures.

Cross-Border Procurement Risks and Strategic Advice for Data Center Infrastructure

What are the primary risks in cross-border sourcing of high-value data center equipment?

The main risks include logistical damage to sensitive electronics and regulatory hurdles regarding encryption technology. To mitigate these, use specialized shock-absorbent packaging and insist on Pre-Shipment Inspection (PSI) by third parties like SGS or Intertek. Ensure all Export Control Classification Numbers (ECCN) are verified to prevent customs seizures related to dual-use technology regulations.

How should buyers negotiate with suppliers on Made-in-China.com for large-scale infrastructure projects?

Focus negotiations on Total Cost of Ownership (TCO) rather than just the initial purchase price. Request tiered pricing based on MW capacity and negotiate for extended warranties (3-5 years) and on-site commissioning support. For large orders, use Letter of Credit (L/C) or Escrow services to ensure payment is only released upon successful site acceptance testing (SAT).

What shipping methods are recommended for sensitive data center components to specific global regions?

For sensitive components like CPUs and SSDs, Air Freight with temperature-controlled environments is preferred to prevent humidity damage. For heavy infrastructure like PDU cabinets or cooling towers, Sea Freight using Open Top or Flat Rack containers is more economical. Always secure All-Risk Marine Insurance that covers the full replacement value plus shipping costs.

How can transaction security be guaranteed during high-value B2B cross-border trades?

Always verify the supplier's Audited Supplier status on Made-in-China.com to confirm their manufacturing capability and legal existence. Utilize Secured Trading Services to protect your funds. Before final payment, require a Factory Acceptance Test (FAT) report and video evidence of the equipment functioning under load to ensure the product meets the agreed-upon technical benchmarks.

Related queries