Power transformer
I have found results from70000+products and30000+suppliers aboutPower transformer
Electrical Power Step Down Isolation Power Supply Dry Type & Oil Immersed Transformer
100mva Power Three Phase Electrical Distribution High Voltage Oil Immersed Transformer
1000kVA Step Up Oil-immersed Electric Power Transformer for High Voltage
11kv /500kVA Three Phase Outdoor Type Power Distribution Electrical Transformer Oil Immersed Transformer
Industrial 150MVA 138kV/69kV FR3 3 Phase hv ONAN/ONAF Oil Immersed Power Transformer UL Certified
Oil Immersed Power Transformer Step-up for Solar Applications Optimal Energy Efficiency Boost
35kv-363kv 3.15kv-66kv 2000kVA-300mva Oil Immersed Large High Voltage Substation Electric Power Transformer
Made in China Dry-Type High Insulation Transformers for Industrial Power Distribution
10kv Cast Resin Dry Type Power Distribution Transformers for Solar PV Plant
Cast Resin Dry Type 2000kVA Three Phase Step Down Distribution Power If Transformer
High Efficiency Oil Immersed Outdoor Voltage Power Transformer
OEM Three Phase 3 Stepdown Oil Immersed Power Distribution Transformer
High Voltage Distribution Power Transformer Outdoor Sealed on-Load Oil Cooled Three-Phase Transformer
High Efficiency Mining Dry Type Explosion-Proof Power Transformer
Sourcing guidance for Power Transformer
What are the key technical specifications to consider when selecting a Power Transformer?
When sourcing power transformers, you must prioritize Rated Capacity (kVA/MVA), Voltage Ratio (e.g., 11kV to 415V), and Phase Configuration (Single or Three-phase). Ensure the Insulation Class (Class F or H) matches your thermal requirements and verify the Cooling Method (ONAN, ONAF, or Dry-type AN). Additionally, check the Impedance Voltage percentage, as it directly affects short-circuit current and voltage regulation.
Which international compliance standards are mandatory for global trade of transformers?
Suppliers must adhere to IEC 60076 for power transformers or IEEE/ANSI C57 for North American markets. For European distribution, CE marking and compliance with the Ecodesign Directive (Tier 2 efficiency levels) are essential. Ensure the manufacturer holds ISO 9001 for quality management and ISO 14001 for environmental standards to mitigate operational risks.
How can I evaluate the energy efficiency and economic feasibility of a transformer?
Focus on the No-load losses (Iron losses) and Load losses (Copper losses). While high-efficiency transformers (using Amorphous Alloy cores) have a higher initial purchase price, they offer a lower Total Cost of Ownership (TCO) over a 20-year lifespan. Request a Loss Capitalization Formula from the supplier to calculate long-term energy savings against the upfront investment.
What usage scenarios dictate the choice between Oil-Immersed and Dry-Type transformers?
Oil-Immersed transformers are preferred for outdoor high-voltage substations and industrial plants due to superior cooling and durability. However, for indoor environments, high-rise buildings, or hospitals, Cast Resin Dry-Type transformers are mandatory because they are fire-resistant, self-extinguishing, and environmentally friendly (no oil leakage risk).
Cross-Border Procurement Strategy & Risk Management
What are the primary risks in cross-border transformer purchasing and how to mitigate them?
The biggest risks include damage during transit and specification mismatch. To mitigate these, mandate Seaworthy Packaging (vacuum sealing and heavy-duty wooden crates) and hire a third-party agency like SGS or Intertek for a Pre-Shipment Inspection (PSI). Always use Made-in-China.com’s secured payment services to ensure funds are only released upon proof of shipment.
How should I negotiate with Chinese transformer manufacturers for the best terms?
Focus on the Copper vs. Aluminum winding debate; copper is more expensive but more conductive. Negotiate based on the current LME (London Metal Exchange) copper prices to ensure transparent pricing. Request a warranty period of at least 24 months and ask for 5% spare parts (bushings, gaskets) to be included in the bulk price.
What logistics and shipping precautions are unique to heavy power equipment?
Transformers are heavy and sensitive. Ensure the bill of lading specifies 'No Stack' and 'Top Heavy'. For large units, require Impact Recorders to be attached to the crate to monitor G-force shocks during sea freight. Confirm the supplier provides a Full Set of Technical Documents, including Type Test Reports and Routine Test Certificates, which are vital for customs clearance and local grid connection.





























