Sts meter
I have found results from10000+products and5000+suppliers aboutSts meter
DN15~25mm R100 Sts Prepaid Smart Water Meter with Valve Control
DN15~DN25 Sts Integrated Prepaid Split Type Water Flow Meter for Residence
15mm Sts Multi Jet Dry Type Plastic Body Prepaid Water Meter
STS Prepaid Valve Control Smart Water Meter with AMR
Single Phase Sts Dlms Remote Control Enery Meter Multimeter
Met321 Three Phase Sts Dlms Remote Smart Energy Meter
Three Phase Sts Conventional Prepaid Prepayment Energy Meter
Three Phase Sts Integrated Prepaid Prepayment Energy Meter
DN15 Integrate and Split Type Sts Keypad Prepaid Prepayment Water Meter
Single Phase Smart Sts Prepaid Prepayment Energy Meter
Weizidom 2025 New DN150 Sts Horizontal Type with Iron Shell Cold Water Meter
RS485 Single Phase Sts Keypad Smart Electric Prepaid Energy Meter
Ultrasonic Sts Water Meter Prepaid Token Water Meter Lora with or Without Ciu
DN15-DN25 Integrate and Split Type Sts Keypad Prepaid Prepayment Water Meter
DN15 Integrate Split Type Sts Keypad Prepaid Water Meter China
DC3.6V Lithium Battery Sts Prepaid Smart Water Meter, IP68
Sts Keypad Prepaid High Precisionwater Meter Used for Residential /Apartment /Commercial DN15-DN50
Yujian Ddzy-668-Sts Singnal-Phase Prepayment Meter
Sts DIN-Rail Single Phase Prepaid Electricity Meter with Ciu LCD Screen
DN 15/20/25 Sts Keypad Prepaid Split Smart Water Meter, with Ciu, LCD, IP68
Three Phase Smart Electricity Meter with Sts 20-Digit Token System
Sourcing guidance for Sts Meter
What are the key technical standards for STS Meters?
The most critical requirement is STS Association certification, which ensures the meter follows the IEC 62055-41/51/52 protocols for secure token transfer. Additionally, ensure the meter meets IEC 62053-21 for Class 1.0 or Class 2.0 static metering accuracy. For international markets, look for DLMS/COSEM compliance to ensure interoperability with different Head-End Systems (HES).
How do I choose between Integrated and Split-type STS Meters?
Choose Integrated Meters for indoor installations where space is limited and cost-efficiency is a priority. Opt for Split-type Meters (with a Customer Interface Unit - CIU) for outdoor or pole-mounted installations to prevent tampering and energy theft, as the measurement unit remains inaccessible to the user while the CIU allows for convenient credit entry.
What communication modules are essential for smart STS metering?
Depending on your infrastructure, you should select modules like GPRS/4G, NB-IoT, or LoRaWAN for remote data collection and AMI (Advanced Metering Infrastructure) integration. For communication between the meter and the CIU in split types, PLC (Power Line Carrier) or RF (Radio Frequency) are the most reliable methods to ensure stable signal transmission.
What anti-tamper features should I look for in an STS Meter?
High-quality STS meters must include terminal cover open detection, magnetic field interference protection, and neutral line current measurement to detect bypass attempts. Ensure the meter has a non-volatile memory that retains credit and event logs even during prolonged power outages.
Cross-Border Procurement & Risk Management for STS Meters
How can I verify the security of the STS encryption keys?
Ensure the supplier is a registered member of the STS Association. You must confirm that they can provide a Supply Group Code (SGC) and support the Key Management System (KMS). Request a security audit report to ensure their manufacturing process prevents unauthorized access to the Vending Keys.
What are the risks of purchasing STS meters from unverified suppliers?
The primary risk is token incompatibility, where the meter fails to accept standard 20-digit tokens. To mitigate this, use Made-in-China.com's 'Audited Supplier' reports to verify the factory's R&D capabilities and quality control certifications. Always request a functional sample to test with your local vending software before placing bulk orders.
How should I handle international shipping and customs for electronic meters?
STS meters contain sensitive electronics and sometimes internal batteries. Ensure the supplier uses anti-static packaging and provides UN38.3 certification if lithium batteries are included. For shipping to regions like Africa or Southeast Asia, clarify the HS Code (typically 9028.30) to determine accurate import duties and VAT.
What negotiation strategies work best for large-scale utility projects?
Focus on the Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (3-5 years) and the inclusion of technical training for local engineers. For orders exceeding 5,000 units, request customized firmware and a tiered pricing structure that offers 10-15% discounts on subsequent maintenance batches.





























