SourcingAI

Sts meter

I have found results from10000+products and5000+suppliers aboutSts meter

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: High-voltage
Type: Power Meter
Type: Energy Meter
Structure: Three-column Disconnector
Operation: Hydraulic
Grounding Mode: Grounding
Horizontal Rotary Type
Number of Poles: Three Pole
Grounding: Single Ground
Series: Three
Turn the Horizontal
Switching Mode: Double-Throw Type
Common Model: DR
Structure of Operating: Electric
Certification: ISO
Install: Horizontal
Medium Temperature: Cold Water
Level Measurement: B
Digital and Analogue
Application: Civil
Speed of Water Meter
High-pressure Water Meter
Dry Water Meter
Intelligent IC Card
Nominal Diameter: 15-50mm
Display: Digital
Multi-Functional Energy Meter
Electric Equipment: Three-phase Four-wire
Theory: Electronic Meter
Power Meter Connection: Terminal
Measured Signal: Pulse Peak
Customized: Customized
Installation: Direct Connected
Certification: GS
Certification: RoHS
Certification: CE
Certification: IS9001
Certification: ISO9001
Certification: ISO9002
Certification: ISO2000
Level Measurement: C
Level Measurement: A
Counter Instructions: Digital
Counter Instructions: Analogue
Application: Industrial
Principle: Volumetric Meter
General Water Meter
Wet Water Meter
Liquid Sealed Water Meter
Stucture: Wireless Communicating
Stucture: Traditional
Nominal Diameter: Small Diameter
Usage: Watt-Hour Meter
Meter for Industry and Home Use
Standard Electric Energy Meter
Usage: Prepayment Meter
Reactive Energy Meter
Multi-rate Watt-hour Meters
Maximum Demand Meter
Electric Equipment: Single-phase
Theory: Static Meter
Measured Signal: Continuous Wave

Sourcing guidance for Sts Meter

What are the key technical standards for STS Meters?

The most critical requirement is STS Association certification, which ensures the meter follows the IEC 62055-41/51/52 protocols for secure token transfer. Additionally, ensure the meter meets IEC 62053-21 for Class 1.0 or Class 2.0 static metering accuracy. For international markets, look for DLMS/COSEM compliance to ensure interoperability with different Head-End Systems (HES).

How do I choose between Integrated and Split-type STS Meters?

Choose Integrated Meters for indoor installations where space is limited and cost-efficiency is a priority. Opt for Split-type Meters (with a Customer Interface Unit - CIU) for outdoor or pole-mounted installations to prevent tampering and energy theft, as the measurement unit remains inaccessible to the user while the CIU allows for convenient credit entry.

What communication modules are essential for smart STS metering?

Depending on your infrastructure, you should select modules like GPRS/4G, NB-IoT, or LoRaWAN for remote data collection and AMI (Advanced Metering Infrastructure) integration. For communication between the meter and the CIU in split types, PLC (Power Line Carrier) or RF (Radio Frequency) are the most reliable methods to ensure stable signal transmission.

What anti-tamper features should I look for in an STS Meter?

High-quality STS meters must include terminal cover open detection, magnetic field interference protection, and neutral line current measurement to detect bypass attempts. Ensure the meter has a non-volatile memory that retains credit and event logs even during prolonged power outages.

Cross-Border Procurement & Risk Management for STS Meters

How can I verify the security of the STS encryption keys?

Ensure the supplier is a registered member of the STS Association. You must confirm that they can provide a Supply Group Code (SGC) and support the Key Management System (KMS). Request a security audit report to ensure their manufacturing process prevents unauthorized access to the Vending Keys.

What are the risks of purchasing STS meters from unverified suppliers?

The primary risk is token incompatibility, where the meter fails to accept standard 20-digit tokens. To mitigate this, use Made-in-China.com's 'Audited Supplier' reports to verify the factory's R&D capabilities and quality control certifications. Always request a functional sample to test with your local vending software before placing bulk orders.

How should I handle international shipping and customs for electronic meters?

STS meters contain sensitive electronics and sometimes internal batteries. Ensure the supplier uses anti-static packaging and provides UN38.3 certification if lithium batteries are included. For shipping to regions like Africa or Southeast Asia, clarify the HS Code (typically 9028.30) to determine accurate import duties and VAT.

What negotiation strategies work best for large-scale utility projects?

Focus on the Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (3-5 years) and the inclusion of technical training for local engineers. For orders exceeding 5,000 units, request customized firmware and a tiered pricing structure that offers 10-15% discounts on subsequent maintenance batches.

Related queries