SourcingAI

Construction equipment

I have found results from30000+products and10000+suppliers aboutConstruction equipment

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Concrete Mixer
Type: Crawler
Pressure Pile Driver
Type: Crawler Excavator
Asphalt Mixing Plant
Powered Pallet Truck
Concrete Mixing Plant
Type: Straight Arm
Shotcrete Type: Semi-Dry
Brick Cutting Machine
Structure: Cylinder Type
Productivity: 75m²/h
Feeding Height: 1390mm
Vibrating Amplitude: 1.1mm
Condition: New
Color: Red
Certification: ISO 9001:2008
Drill Hole Diameter: <100mm
Drill Hole Depth: 100-150m
Drilling Way: Rotary
Bit Type: Cone Bit
Power Supply: Electric
Voltage: 380V
Vertical Delivery Distance: 30M
Horizontal Delivery Distance: 60M
Hopper Volume: 60L
Power Source: Electric
Noise: With Noise
Control Type: CNC
Automatic Grade: Automatic
Shaft Type: Double
Layout: Horizontal
Hydraulic Pile Driver
Pile Hammer Type: Hydraulic Hammer
Usage: Special Excavator
Bucket: Grab Shovel
Transmission: Hydraulic Transmission
Drive Type: Electric Drive
Size: Small-Scale
Asphalt Concrete Pavement
Moving Type: Fixed
Mixing Method: Intermittent Compulsory
Product Capacity: 40~400t/h
Cab Location: Adjustable
Power: DC Motor
1T - 5T
Fuel: Electric
Load center: 500mm
Rated Load: 1-3t
Load and Unload Mode: Front Discharge
Walking Mode: Wheeled
Working Method: Single-Foot
Axle: Uniaxial Monowheel
Sheep Foot Roller
Compaction Depth: 25cm
Centrifugal Force: 13KN
Cup Quantity: 6
Screw Design: Double-Screw
Customized: Customized
Motor Power: 75kw
Maximum Lifting Height: >40m
Maximum Lifting Weight: >16t
Shaft Number: 2
Crane Jib: Four-Arm
Shotcrete Type: Wet
Machining Process: Hydraulic
Welded Molding Machine
Structure: Rotor Type
Structure: Spiral Type
Productivity: 25m²/h
Feeding Height: 1370mm
Vibrating Amplitude: 0.9mm
Vibrating Amplitude: 1.6mm
Vibrating Amplitude: 0.8mm
Condition: Used
Color: Orange
Color: Yellow
Certification: ISO 9001:2000
Certification: CE
Certification: ISO9001: 2000
Certification: ISO
Certification: GS
Certification: RoHS
Certification: ISO9001
Certification: TUV
Drill Hole Diameter: >300mm
Drill Hole Depth: >150m
Drill Hole Depth: 10-30m
Power Source: Diesel
Automatic Grade: Semi-Automatic
Shaft Type: Single
Layout: Vertical
Usage: Marine Excavator
Usage: Mining Excavator
Usage: GM Excavator
Transmission: Hydraulic
Rated Load: 6-9t

Sourcing guidance for Construction Equipment

What are the key technical specifications to evaluate when sourcing heavy construction machinery?

Buyers must prioritize engine performance and emission standards, ensuring engines meet Tier 4 Final or Stage V requirements for international markets. Key metrics include hydraulic flow rates for excavators, lifting capacity and reach for cranes, and operating weight for rollers. Always verify the use of branded core components (e.g., Cummins engines, Kawasaki pumps, or Rexroth valves) to ensure long-term reliability and ease of sourcing spare parts.

Which international compliance standards are mandatory for construction equipment?

Equipment must adhere to CE marking for the European Union, ANSI/ASME for the United States, and ISO 9001 for general manufacturing quality. For safety, ensure machines have ROPS (Roll-Over Protective Structure) and FOPS (Falling Object Protective Structure) certifications. Additionally, noise emission certifications are increasingly required for urban construction projects.

How can a buyer verify the structural integrity and durability of the machinery?

Request ultrasonic weld testing reports and stress analysis data for critical load-bearing structures like booms and chassis. Ensure the steel used is high-tensile grade (e.g., Q345B or Q460). For equipment used in harsh environments, confirm the IP rating for electrical components (minimum IP65) and the quality of anti-corrosion coatings.

What role does technology integration play in modern construction equipment procurement?

Modern procurement should focus on Telematics and GPS integration, allowing for real-time fleet monitoring, fuel consumption tracking, and remote diagnostics. Compatibility with BIM (Building Information Modeling) and the presence of automated grade control systems can significantly increase project efficiency and are highly valued in high-end markets.

Cross-Border Procurement & Risk Management for Heavy Machinery

What are the primary risks in cross-border transactions for large-scale equipment?

The main risks include logistical damage during transit and non-conformity with local road regulations. To mitigate these, use Trade Assurance services on Made-in-China.com to secure payments. Always hire a third-party inspection agency (like SGS or Intertek) to perform a Pre-Shipment Inspection (PSI) to verify the machine's functions and specifications before the final balance is paid.

How should shipping and logistics be handled for oversized construction machinery?

For heavy equipment, Ro-Ro (Roll-on/Roll-off) shipping is the safest method to prevent lifting damage. If using containers, machines must be professionally dismantled and lashed according to international maritime standards. Ensure the supplier provides a detailed packing list and re-assembly manual, and clarify Incoterms—FOB is generally preferred for buyers who have established relationships with specialized heavy-lift forwarders.

What strategies are effective for negotiating with construction equipment suppliers?

Focus negotiations on Total Cost of Ownership (TCO) rather than just the sticker price. Negotiate for a comprehensive spare parts package (filters, seals, and wear parts for the first 2,000 hours) to be included in the deal. For bulk orders, seek extended powertrain warranties (e.g., 24 months or 4,000 hours) and on-site technical training for your local operators.

How can buyers ensure long-term after-sales support in a different country?

Confirm if the supplier has authorized service centers or local distributors in your region. If not, mandate the provision of digital parts catalogs and English-language service manuals. Ensure the contract includes a guaranteed response time for technical support and a commitment to air-freight critical components in the event of a machine-down situation.

Related queries